2025 – Rio Tinto Marandoo Dewatering 33kV Powerline Design – GENUS

33kV powerline modification works design to connect the new Marandoo Dewatering Substation to the existing RTIO 33kV Network. Scope included:

  • design of five new equipment poles and t-off to the new spur line
  • drafting in Microstation and CAD Conform
  • HV cable underground trench and directional drilling section
  • procurement and project interface with the end Client
  • manage the consultant to complete the electrical power studies, earthing design and HV Submission

2025 – Rio Tinto South Fortescue Bore 7 33kV Powerline Design – GENUS

33kV powerline modification works design to connect the new Bore 7 headworks pump LV MCC to the existing RTIO 33kV Network. Scope included:

  • design of one new suspension type pole top transformer pole
  • drafting in Microstation and CAD Conform
  • upgrade the insulators on the adjacent existing strain lattice tower
  • LV cable underground trench section
  • procurement and project interface with the end Client
  • manage the consultant to complete the electrical power studies, earthing design and HV Submission

2025 – Rio Tinto Tom Price LIA 33kV Powerline Bypass Design – GENUS

33kV powerline works design to bypass the faulty 33kV RMU and t-off from the last pole on the existing RTIO 33kV Network. Scope included:

  • design of four new equipment poles and t-off to the new spur line
  • HV cable underground trench
  • upgrade the existing termination pole with t-off crossarm and insulators
  • procurement support and project interface with the end Client

2025/2026 – WaterCorp Dedari Pump Station 33kV Switchyard Equipment Replacement Design – EWS

33kV upgrade works design in the existing Dedari Pump Station 33kV switchyard. Scope included:

  • design of five new equipment poles
  • procurement support and project interface with the end Client
  • manage the consultant to complete the electrical power studies, earthing design and HV Submission

2025 – Goldfields Lefroy 66kV Powerline New T-off to Bay 4 – EWS

Design of a new t-off pole to feed new Bay 4 at the Lefroy 66kV switchyard. Scope included:

  • design of new t-off pole and new termination pole for bay 4 connection
  • procurement support and project interface with the end Client

2025 – Transalta 132kV Powerline – Pole 1 and Pole 73 Replacement – Fletcher Electrical

Design of powerline modification works to replace two poles damaged by corrosion